• Pipepro
  • PipePro XT
  • PipePro 96

Pipepro

For the customer focused on mass-producing a wide variety of concrete pipe and manhole sizes simultaneously, either in a fully automated or semi-automated setting, the PipePro is the ultimate tool.

Utilizing the three-station turntable principle, Synchronized Core Vibration (SCV) and Multiform technology, the PipePro consistently produces quality concrete pipe in a highly efficient manner with mold changeover times of less than 45 minutes.

Up through 500mm (21″) diameter, the PipePro effortlessly produces more than one pipe/minute – without the need for a machine monitor.

View a typical PipePro Automatic Plant layout »

  • Typical fully automatic PipePro layout complete with a circulating moving floor curing system for continuous production; automatic offbearer;  automatic joint ring handling including removal, cleaning, storage, and retrieval;  automatic post-processing including deburring, testing, and marking; and product handling with automatic finished pipe out-feed and sorting.

View a typical PipePro plant layout with Independent Joint Ring and Product Handling Robotics »

  • Typical PipePro layout for producing high quantities of pipe and manholes up to 1800 millimeters in diameter; complete with automated product handling, joint ring removal, cleaning, storage, and retrieval,  and fully automatic post-processing including testing, marking, and deburring.

Download PipePro Brochure

PipePro XT

  • Fully Automatic Operation
  • Quadform modules up to 500mm (21″)
  • Triform modules up to 600mm (24″)
  • Duoform modules up to 800mm (30″)
  • Single forms up to 1800mm (72″)
  • Maximum pipe length of 3.5m (12′)
  • 45 minute mold changeover

PipePro XT

PipePro 96

  • Fully Automatic Operation
  • EightPak modules up to 450mm (18″)
  • SixPak modules up to 600mm (24″)
  • Quadform modules up to 800mm (30″)
  • Triform modules up to 900mm (36″)
  • Dualform modules up to 1200mm (48″)
  • Single forms up to 2500mm (96″)
  • Maximum pipe length of 3.5m (12′)
  • 45 minute mold changeover

PipePro 96



  • Three Station Turntable Principle
    Telescope your production processes for maximum efficiency.A traditional concrete pipe machine has three major processes. First the mold is filled, second the filled mold is pressed with a spigot former, and finally the pipe is demolded. Utilizing the Three-Station principle, all these processes happen at the same time - multiplying the productivity.


  • Exact Length Products
    Remove product variability by ensuring each product is exactly the same length. Many concrete pipe production machines are unable to accurately control the length of their products. Through a mixture of volumetric fill control, a proprietary pressheading process and precision mold quality, the PipePro eliminates this inconsistency.


  • Header System
    Produce pipe with perfectly round, glass-like spigots - ensuring exact field pipe connections.Use of stay-in-place headers allows for the production of pipe with more precise male-end spigots with a smoother surface finish.


  • Synchronized Core Vibration (SCV)
    High-powered, built-in, electrically- driven core vibration system allows for the production of high-quality pipe and eases form changeover. In a SCV system, every form set has its own built-in vibration system. The use of such a system gives the added benefit of eliminating the need to swap vibrators from core to core during changeover, eliminating the costly downtime and increasing plant flexibility.


  • Multiforms
    Easily multiply your production tonnages through the use of patented Multiforms. The PipePro machines allow for the possibility of mass-production through the use of the Multiform system -allowing the producer to increase his output by 2x, 3x, 4x, 6x and even 8x -without significantly affecting cycle times.


  • Quick Mold Changeovers
    Be Flexible. Don't tie up your money in excess pipe inventory.Simple, machine-to-mold connections and self-contained mold modules allow for changeovers of less than 45 minutes on the PipePro machines.


  • Fully Automatic Operation
    Automate to save labor and achieve precisely repeatable production cycles, guaranteeing each product is as high-quality as the next.All production steps in the PipePro machines are computer-controlled, including vibration, concrete filling, pressheading and optionally, demoulding.


  • Optional Cast-In-Place Manhole Steps
    Eliminate costly and back breaking labor required to drive steps into manhole products.The Cast-In-Place Step (CIPS) program allows for the automatic casting-in of manhole steps - including an automated step- insertion robot to keep the machine operator working at a safe distance from the machine.


  • Optional Lifting Anchor Automation
    Save labor costs by automatically casting lifting anchors into products during machine cycle.One of the most tedious and labor-consuming tasks in a manhole or pipe operation is the insertion and driving in of lifting anchors into already-cured products. Eliminate this step with an automated lift-anchor insertion system.